CHECKLIST FOR WRITTEN DOCUMENTATION REQUIRED BY THE 21 CFR 803 (MDR) and 21 CFR 820(QSR, cGMP)
Courtesy of fda-consultant.com
| Required Procedures | 21 CFR Section | Check |
| Procedures for MDRs | 803.17 | |
| A documented quality program | 820.20 | |
| Documentation of Management review of quality system at defined intervals and at sufficient frequency | 820.20 | |
| Procedures for audits | 820.22 | |
| Records of audits | 820.22 | |
| Procedures for identifying training needs | 820.25 | |
| Documentation of any necessary personnel training programs | 820.25 | |
| Documents relating to design controls including the Design History File | 820.30 | |
| Procedures for specification control measures to assure that device, components , and packaging design results in approved specifications | 820.40 | |
| Document controls not previously mentioned | 820.40 | |
| Document of specification changes | 820.40 | |
| Procedure of approval of change of manufacturing process | 820.40 | |
| Record of percentage of defective components for each lot and the percentage of lots rejected | 820.50 | |
| Purchasing controls not previously mentioned | 820.50 | |
| Limitations or allowable tolerances on equipment | 820.70 | |
| Records of equipment inspections | 820.70 | |
| Procedures and specifications for manufacturing processes | 820.70 | |
| Records of maintenance activities | 820.70 | |
| Procedures for processing control | 820.70 | |
| Documentation of inspections of any required environmental control system | 820.70 | |
| Procedures for contamination control | 820.70 | |
| Procedures and schedules for maintenance, adjustment, and cleaning of equipment | 820.70 | |
| Procedures for use and removal of manufacturing material | 820.70 | |
| Record of removal of manufacturing material | 820.70 | |
| Procedure for approval of changes to software programs | 820.70 | |
| Procedures for acceptance of components | 820.80 | |
| Records of acceptance or rejection of components | 820.80 | |
| Procedures for finished device inspection and sampling plans | 820.80 | |
| Documentation of testing of computer software programs for calibrating, inspecting, and checking measurement equipment | 820.84 | |
| Procedures for calibration, inspection, and checking of measurement equipment | 820.84 | |
| Procedures and limits for accuracy and precision in calibration of measurement equipment | 820.84 | |
| Records documenting traceability of calibration standards | 820.84 | |
| Records of calibration, inspection, and checking of measurement equipment | 820.84 | |
| Records of calibration of measurement equipment | 820.84 | |
| Procedures for reprocessing of devices or components | 820.90 | |
| Record (implied) of final inspection of reprocessed device | 820.90 | |
| Records of the disposition of obsolete, rejected, or deteriorated components | 820.90 | |
| Records of investigation of failure of device or components after release for distribution | 820.100 | |
| Procedures for warehouse control and distribution of finished devices Where necessary, system to assure that oldest approved devices are distributed first | 820.124 | |
| Record of examination of labeling materials | 820.162 | |
| Device Master Record | 820.181 | |
| Device History Record | 820.184 | |
| Record of critical operations in device history records by responsible individual | 820.184 | |
| Records of written and oral complaints | 820.198 | |
| Record of complaint investigation or reason no investigation was done | 820.198 | |
| Complaints pertaining to injury, death, or any hazard to safety | 820.198 | |
| Servicing procedures, records, and record evaluations | 820.200 | |
| Statistical techniques: identification of valid techniques, sampling plans, adequacy | 820.250 |